| Tool
making is currently manufactured up to 2 tonnes gross weight. |
|
|
Multi-stage
progression and single operation tooling is designed from component
drawings and customer specifications. |
| All
design work is caried out in house under the control of ISO9001. |
|
| In
house wire erosion is used extensively to control quality and ensure
repeatability if required for spares or duplicate tooling for larger
production runs. |