Consultancy
- Problem Solving - Development Work - Optimising Production
Processes:-
Optimising the:-
Parameter on the Welding Equipment.,
Sonotrode / Horn & Fixturing Design.,
Component Design- Radii, Size & Type of
Energy Director, Geometry, Near/Far Field ., Manufacturing
Process / Output.,
Solving Production Problems:-
Investigate and Resolve
Poor Consistency, High Reject Rate, Marking of
Parts, Parts not Sealing Etc
Possible Causes:- Poor Parts, Component Design,
Poor Tooling, Faulty Equipment, Poor Settings, Present of
Moisture, Material Processing, Storage, Regrind, Mould Release,
Colour, Additives Etc.,
General Training:-
Preventive & General Maintained, Setting of
the Equipment.,
|

|
|