Blacket-Ord
CONSULTING ENGINEERS

Stenkrith Millennium Bridge
Kirkby Stephen



Company Profile
Up

This footbridge provides level access the River Eden and a new footpath which has been created on the dissused trackbed of the Durham and South Lancashire Union Railway (The Stainmore Line).

   

    The site is in an area of outstanding natural beauty and a site of special scientific interest. So great care had to be taken with its design and construction so as not to interfere with the natural environment.
    The bridge provides a superb viewpoint for looking down on the river and its impressive rock formations. The bridge is constructed of galvenised steel with a precast concrete deck.

Client:  Northern Viaduct Trust
Main Contractor:  P Mawdsley
Steel Fabrication:  Blackbrook (CB) Ltd


Blackett-Ord Consulting Engineers
33 Chapel Street, Appleby-in-Westmorland, Cumbria CA16 6QR
Telephone: 017683 52572    Fax: 017683 52572
Email: mail@blackett-ordconsulting.co.uk