In
total about 1,000 meters of cable. The lights are already available
in the hall, one job less to do. 10 Speakers however did have to be
hung up and two speakers put on the stage for the cast to be able to
hear the music.
The next job was to build a
tower at the end of the hall, seen above to house the team. Sounds
on the bottom and lights on the top. This was done so that we had a
clear view of the stage over the heads of the audience.
Most of this work was carried
out on the before the equipment was put in place after the new year.
Microphones were hung over
the stage, 6 in all. With microphones available off stage and 2
microphones on stands at the front.
A camera was also put up for
the cast to see what was going on in the dressing room. More cable!
yes more cable.
What NEXT
