previous manned Mission
Gemini Project page

History home Page

Gemini XI

12th September, 1966

Next manned Mission
unmanned missions

Crew
Charles Conrad Jr.
Richard F. Gordon Jr.

Backup Crew
Neil A. Armstrong
William A. Anders

CapCom Crew
Clifton C. Williams Jr. (Cape)
John W. Young (Houston)
Alan L. Bean (Houston)

Payload
Gemini-XI capsule

Orbit
Altitude: 1368.9 km (739.2nm)
Inclination: 28.83 degrees
Orbits: 44
Duration: 71 hours 17 min 8 seconds
Distance: 1,983,565 km

Mission Objective
Primary objective was to rendezvous and dock with Gemini Agena target vehicle (GATV-5006) which was launched 9/12/66 from Launch Complex 14 as TLV-5306 in 1st revolution. Secondary objectives included: Practice docking, Perform EVA. Conduct 11 experiments, Maneuver while docked (high apogee excursion), Conduct tethered vehicle test, Demonstrate automatic reentry and Park GATV-10 in 352.4km orbit. Spacecraft weight: 3798kg. GATV weight: 8097kg.

Launch
September 12, 1966 9:42:26.546 am EST. The launch was postponed twice; On September 9 due to a small leak in the first stage oxidizer tank of the GLV; and on the 10th due to a suspected malfunction of the autopilot on the GLV. On the day of the launch there was a 16 min hold due to a suspected leak around the command pilot's hatch.

Landing
September 15, 1966. Landing was at 24deg 15.4min North and 70deg 0.0min West. Miss distance was 4.9km (2.65nm). Recovery ship USS Guam (crew onboard in 24 min).

Mission Highlights
All Primary objectives and most secondary objectives were achieved. Experiment D-16, Power Tool Evaluation was canceled when the EVA was terminated early. During EVA, astronaut Gordon tethered the two spacecraft together with a 30-meter line. Automatic reentry was successful.