Construction of main Orphanage building
This is a
cross profile of the whole project.
In the background is George and Hellen's
home (the owners of the Orphanage). In the foreground is the fellowship hall. The brethren
helped to raise money for paint the improve the look of the hall.
In between the home and fellowship hall
is where the new Orphanage is to be constructed. The picture also shows some of the stones
and bricks to be used for the foundations and walls. |
|
 |
|
|
|
Pictured
here are first 2000 bricks for the construction of the Orphanage. In total 6000 bricks
will be required to complete the building.
To the left of the brick is the area
where the pit latrine is being dug. |
|
Pictured
is the construction of the 30' latrine. This is being constructed for sanitation purposes. |
|
 |
|
 |
|
The
foundations for the Orphanage are going in. The use stone for this, and then build on it
with bricks. |
|
The
Orphanage home is shown here under construction. The church (fellowship hall) is shown in
the background.
|
|
 |
|
 |
|
The walls
are now higher than many of the children.
Shown is a wooden structure which is
being used as a temporary kitchen. The permanent kitchen will be built last of all. |
|
Some of
the children looking forward to their new living quarters - standing outside
the existing fellowship hall. |
|
 |
|
 |
|
Barclays
Community Bank, Kisumu give a donation of £500 for the building fund. Some did a
sponsored walk to help raise this money. |
|
Some
images of the inside of the new building.
|
|
|
|
 |